on 2024 Sep 26 1:31 AM
Hi gurus,
we are incorporating a new company and need load some production orders(work in progress) from legacy sap. It is taking a long time scheduling order in CO01, so I'd like to know if its possible turn off detailed scheduling. We tried turn off through OPU3 and OPU7, but it is disabled. Is there a way to turn off or another place?
Thanks in advance.
Elaine