cancel
Showing results for 
Search instead for 
Did you mean: 

How to synchronize modified data from Q to the P system

ping_wu
Member
0 Kudos
158

Dear experts

I have modified some basic information via “Configuration Activities -- Procurement -- Create Purchasing Groups" in SAP Central Business Configuration system.

All the configurations are in the Q system.

How to synchronize theses modified information from Q to the P system?

Accepted Solutions (0)

Answers (1)

Answers (1)

Kelly_Hannel
Product and Topic Expert
Product and Topic Expert

Hello Ping Wu,

The configuration activity "Create Purchasing Groups" is marked as "Redo in P" = NO which means this configuration is relevant for transport. In such situation, you do the configurations in Q, these configurations are captured in the transport and once you are ready, you can release the transport to P. You can download the accelerator "Configuration apps" from the Best Practices Explorer to have a list with the available configurations and the details I mentioned above (*Please login to the Best Practices Explorer for being able to see all the accelerators).

For knowing how to transport in a 2SL environment, please refer to our SAP Help Portal Releasing Configuration into SAP S/4HANA Cloud Production System (2-System Landscape)

Kind regards,

Kelly