on 2023 Dec 12 2:10 AM
I would want to know whether I can set the batch level to material level in S4 HC?If the answer is YES I also want to know how to set it (the steps)
Request clarification before answering.
Please read this note:https://me.sap.com/notes/2863371/E
"the batch level is always defined at material level in S/4 HANA Cloud system “
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 33 | |
| 18 | |
| 14 | |
| 13 | |
| 9 | |
| 4 | |
| 3 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.