cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

How to remove the transportation planning type in ewm delivery

RaghavanKathamuthu
Active Contributor
0 Kudos
860

I would like to do the goods issue in EWM but not able to do it.

kraghavanbindhu_0-1712150700809.png

I would like to remove this indicator. Done the configuration but its not getting updated in new deliveries.

kraghavanbindhu_1-1712150767033.pngkraghavanbindhu_2-1712150783012.png

Have checked some blogs and there its mentioned that BF is causing this issue. But those BF i am not able to deactivate in SFW5

kraghavanbindhu_3-1712150992910.png

How to solve this

Accepted Solutions (0)

Answers (1)

Answers (1)

Rahul_Gandi1
Participant
0 Kudos

Hi Raghavan,

I have encountered a similar issue while processing deliveries, where the Transportation Planning Type was incorrectly determined or not behaving as expected.

This typically happens when Control Keys are activated for the relevant Sales Area or Delivery Types within the TM integration settings. These control keys influence how deliveries are integrated with TM and can override or misroute planning logic if not configured appropriately.

Please verify and deactivate any Control Keys that may be inadvertently assigned. You can follow the path below to check and remove them:

SPRO Path: SIMG → Transportation Management → Integration → Logistics Integration → Internal TM Component Integration

Within this path, review the following configuration activities:

  • Control key assignment to Sales Organization
  • Control key assignment to Delivery Types

Rahul_Gandi_0-1743360827547.png

Make sure that only the intended control keys are active or remove them altogether if TM planning isn't required for those specific deliveries.