on 2024 Mar 01 1:26 PM
Hi All,
I have config the replenishment control for Storage type that needs to replenish with 319 Movement Type. And the same movement is used in WM staging also so I need to do Replenishment for a Material with WM views having Replenishment data.My questions
1. If that material initially received according to the search strategy the stock goes into fixed bin by exceeding the Maximum Qty
2. in LP21 when I execute by giving Storage type we need to click on material stage and TR will get generate how can I config the source storage type and as per 1 question how can I distribute the stock to sources say Reserved stock and to Fixed Bin.
3. 319 Movement is used in both WM staging and Replenishment how can I do both scenarios with the same Movement type.
Thanks In Advance.
Request clarification before answering.
| User | Count |
|---|---|
| 22 | |
| 19 | |
| 14 | |
| 9 | |
| 6 | |
| 4 | |
| 3 | |
| 2 | |
| 2 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.