on 2025 Jun 02 1:48 PM
I have condition types entered manually in sales order creation. After creating a preliminary billing document from sales order, it goes through approval workflow. Once PBD is approved, I have a scheduled job for creation of billing documents from preliminary billing documents. Upon checking of billing document, the conditions I have maintained in sales order are removed. Is there a way to maintain copy control or pricing type for billing document creation from preliminary billing documents?
Request clarification before answering.
Hello @kyle10
You're correct, the system uses pricing type “G” in Public Cloud by default when converting a Preliminary Billing Document (PBD) to a final billing document. This redetermines pricing and deletes any manual conditions entered in the PBD.
My apologies for the misunderstanding. The BAdI SD_BILLINGDOC_ITEM_PREPARE would allow control over this in On-Premise, but it’s not available in Public Cloud, and pricing type cannot be changed via SSCUI or in-app config.
With regards
Chuma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
17 | |
8 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.