cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

How to maintain copy control from preliminary billing document to billing document

kyle10
Discoverer
0 Kudos
266

I have condition types entered manually in sales order creation. After creating a preliminary billing document from sales order, it goes through approval workflow. Once PBD is approved, I have a scheduled job for creation of billing documents from preliminary billing documents. Upon checking of billing document, the conditions I have maintained in sales order are removed. Is there a way to maintain copy control or pricing type for billing document creation from preliminary billing documents?

View Entire Topic
Chuma
Active Contributor
0 Kudos

Hello @kyle10 

You're correct, the system uses pricing type “G” in Public Cloud by default when converting a Preliminary Billing Document (PBD) to a final billing document. This redetermines pricing and deletes any manual conditions entered in the PBD.

My apologies for the misunderstanding. The BAdI SD_BILLINGDOC_ITEM_PREPARE would allow control over this in On-Premise, but it’s not available in Public Cloud, and pricing type cannot be changed via SSCUI or in-app config.

With regards

Chuma