The demand generated from the sales order, after running MRP, is allocated and linked to the sales quotation number.

How to link the demand of a planned order to a sales order1.png2.png

Convert the sales quotation into a sales order, and the planned item category is CP. You can see that a sales order requirement has been generated at this time

3.png4.png5.png

After running MRP, a planned order is generated with a pending sales quotation.

6.png7.png

Is it possible to only have the sales order number on the planned order, rather than the sales quotation number.

Accepted Solutions (0)

Answers (1)

Answers (1)

Lakshmipathi
SAP Champion
SAP Champion
0 Likes

When a sales order originates from a quotation, the system continues to reference the quotation number in the planned order. At present, there is no standard configuration to replace the quotation reference with only the sales order number. This behavior is by design, and SAP has confirmed that the linkage to quotations remains visible in planned orders when the sales order is created from a quotation. Check SAP note 1516971 confirming this