cancel
Showing results for 
Search instead for 
Did you mean: 

How to determine a storage location based on a cost center

0 Kudos
694

Hi,

When I'm automatically creating a material document (MIGO) I need to determine the storage location based on the cost center. How can I solve this problem?

FredericGirod
Active Contributor

You should ask in a functional tag.

I am really doubtful about a link between CO object and Master data Organisational object

Accepted Solutions (0)

Answers (3)

Answers (3)

sanilbhandari
Product and Topic Expert
Product and Topic Expert

Hi 95victoria

Just from a pure process perspective, if you use a cost center, it means you are incurring an expense and the material is issued for consumption directly. Why would you use a storage location for the same? Should this not be a question to your business owner?

Thanks & Regards

Sanil Bhandari

DominikTylczyn
Active Contributor

Providing a cost center and a storage location actually makes sense in case of purchasing of non-valuated but stock-managed materials.

BijayKumarBarik
Active Contributor
0 Kudos

While GR(MIGO) for consumption PO with account assigned PO of K- system will not prompt you enter storage location and you can save the material document.

Not sure why relationship needed with cost center and storage location but alternately you can try having GOITEM-LGORT(Storage Location) as required entry in OMJX t.code and save.. Now check system behavior during goods receipt with MIGO.

drbharucha
Active Participant
0 Kudos