cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

How to define possible BOM usage/composition for material master

MaciejN
Discoverer
0 Likes
316

Hello Dear All,

I am operating on the configurable materials which are saved as a new material master after each configuration.
As a result I am receiving a BOM with usage type U (universal), but  purchasing department needs also the usage type M (manufacturing BOM) to order the necessary parts properly. In my case the M-bom is completely empty in CS03. How to define the usage in this situation?

Thank You in advance!
MN

Accepted Solutions (0)

Answers (1)

Answers (1)

Lakshmipathi
SAP Champion
SAP Champion
0 Likes

Usage type U is flexible and often used as Configurable BOMs, but it does not automatically replicate to usage type M. When a new material is created from a configuration, the system does not copy the BOM to usage M, unless explicitly instructed. As a result CS03 with usage M shows no components, even though they exist under usage U

What you can do is go to cs01 to create a BOM for the newly generated material. Set BOM usage = M. Copy components from the U-BOM or use reference BOM if applicable
Create a reference BOM that links multiple material variants to a single BOM structure. This allows consistent component usage across variants and supports multiple usage types