Hi,
I want to control and assign multiple output types automatically when PO is created,
and those output types should be assgined to one PO.
I assume configuration "Maintain message determination schema" and its step(STUNR), counter(ZAEHK), requirement(KOEBD) can be the solution, but I'm not sure how those fileds work.
Could you please teach me how I can control mutiple assignment of output types?