on ‎2024 Apr 02 5:45 PM
I have a item in one of my plants which is manufacturing a part. It is selling it to the sister plant. This should go at cost to the sister facility. However when the cost roll is done at the sister plant the material is not being picked up correctly and there is also labor coming in as well. The price was loaded into the sister facility and there is no router and BOM. The flag is also set up as a buy item. Any suggestions?
Request clarification before answering.
| User | Count |
|---|---|
| 33 | |
| 18 | |
| 14 | |
| 13 | |
| 9 | |
| 4 | |
| 3 | |
| 1 | |
| 1 | |
| 1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.