How do we assign multiple work centres for one material ?

View Entire Topic
Ram_Thakur_9999
Explorer
0 Kudos

If Assign Routing with Different Work Centres which control key should be used either PP01 and PP03 Control key for Last Operation.

Which Control key should be assigned for the above activity?

Prasath
Contributor
0 Kudos

Hi Ram,

You can assign the control key depends business requirements, like all operation required confirmation, Milestone confirmation required. auto GR or operation with inspections,

Also if you are assigning control key on Work center as default value that will be automatically copied in routing

Regards

Prasath