on 2025 Jan 03 6:53 AM
Hello All Members,
I have a question on the functionality of Scheduling of freight document through Optimizer planning.
I know the Planned Arrival and Planned Departure date is determined through scheduling (Forward and Backward). However, how Optimizer determined that I need to perform forward or backward scheduling?
Could you please help me understand the logic?
Thank you
#SAPTM #Scheduling
Request clarification before answering.
Hello @Mohit07,
I guess you mean the behavior of VSR scheduling.
Please have a look into this note https://launchpad.support.sap.com/#/notes/3259719
The VSR optimizer does not have one scheduling direction, it does it cost based. It uses its optimization approaches to get a solution that adheres to all hard constraints with compact freight orders and lowest possible costs.
Best regards,
Kathrin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 26 | |
| 13 | |
| 13 | |
| 6 | |
| 4 | |
| 4 | |
| 4 | |
| 4 | |
| 4 | |
| 4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.