How can I see when the batch under QA inspection status is to be released in ECC for a plant?

dhineshpanneer
Explorer
0 Kudos
1,524

For example, I can see a batch under QA inspection via T-code MMBE, but when I go to MD04 we don’t see any QM Lots and the inspection lot can be seen as available stock. Therefore I’m stuck to see when this inspection lot is planned for release.

View Entire Topic
JL23
Active Contributor
0 Kudos

Won't you do the usage decision when you are done with the inspection?

dhineshpanneer
Explorer
0 Kudos

Yes is there any way I can find out on what date the user is going to release the batch or UD the lot?

JL23
Active Contributor
0 Kudos

when he is ready. Ask him. Why do you think he has to wait to do it?

You actually define in a goods receipt processing time in your material master. And this processing time includes the time needed for the quality inspection. In MD04 you have a button at the bottom to decide if you want to see the entries related to the availability or to the goods receipt date.