on 2019 Sep 24 2:53 PM
Hello all,
I want to optimize the number of setups in my production plan.
How can I do it?
Thank you.
Regards,
Jose
Request clarification before answering.
Jose,
Que question is what are you doing when you say setup?
Is a physical machine preparation? If yes, then in case you can change the lot sizes and produce more from the same material.
BE more specific if you want to get someone answering your question.
Regards,
Mariano