cancel
Showing results for 
Search instead for 
Did you mean: 

How can I do a material to material STOwith different UOM

0 Kudos
182

We have a material where the GR is in KG. But we issue the material in sack. Can I do a mat to mat using different UOM?

View Entire Topic
0 Kudos

If you really need to do it, you can issue 1 material to a cost center and withdraw the other material against the same cost center.

PS: this will have a financial impact of both the materials have different valuations.