on 2025 Jul 28 4:53 AM
Hi Community!
Please help me.
How activation of actual CCS in actual costing run?
I met this error message when I run actual costing with YTD run type of ledger.
ML4HRUN 201 1 Subsequent activation of actual CCS in run interval for valuation area 4310
Thank you very much in advance!
Huny
Request clarification before answering.
Hi @huny,
CCS (cost component split) is automatically active during activation of scope item 33Q (Actual Costing), together with WIP revaluation at actual costs and Activity consumption update in actual quantity structure, which traditionally need to be manually selected and activated in on-premise editions.
For the error you ran into, could you check if it's because your scope item activation is later than period 001 of 2025? CCS initial records are generated during the activation.
Thanks!
Grace
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 31 | |
| 17 | |
| 16 | |
| 6 | |
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.