on 2020 Jul 10 12:40 PM
Dear Experts
While doing a project, our client requirement is POOL ASSET MANAGEMENT. My client has many types of equipment that are used as a pool on HOUR BASE, for example, Welding Machine, Fork Lifter, Compressors, Cranes, Printers any many more.
I have complete the configuration and the system works fine only for those types of equipment that are performed on Milage (Kilometer) but my issue is with Hour base equipment. The system shows an error "No measurement point identified". If I will assign multiple counters (KM + Time) with this equipment system work fine. but this is not the right way because the system read two different activity types and charge accordingly.
Please help me to resolve the problem, as client want to use only one activity type for each type of equipment.
Request clarification before answering.
Jawwad Ahmed Khan
You can assign any number of measurement points to the equipment.
Its the maintenance plans that determine which measurement point to use. So you can have one plan for HOUR BASED maintenance and another for KM/TIME BASED maintenance.
.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
120 | |
9 | |
8 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.