on 2018 Mar 23 12:55 AM
We have ARM flow.A claim will be created and the corresponding Returns delivery would be performed Post Goods Issue, based on which Credit Memo request will be generated.
But when I include Z01,Z05 (Copy of 01,05 inspection types) in the Material Master, Post Goods Issue is not happening for the Returns delivery and below error message Comes up.
My requirement is to not to the Inpsection Lot generated for the ARM set up. How to overcome this error, while still holding the inspection type Z01 as this is required for inspection lot generation while GR for PO. Any Suggestions to overcome this error?
Thanks for your reply.
Message No. QA495
You want to make a stock posting to/from the inspection stock. This is not allowed for material 28-1005-01 because the quality inspection control has been activated by QM.
The following cases can occur:
Dear Vijaya M,
thank you for mentioning the movement type.
I found following information, which might help you further:
"...
with Advanced Returns Management the inspection process is handled outside the QM application and without any inspection lot. Transaction MSR_INSPWH is used to record the inspection data and trigger the follow-up activities such as posting to scrap/free. In order to avoid message QA495 during the GR of the returns delivery you could deactivate the QM for movement type 655 at customizing path (transaction QCC0):
IMG
>Quality Management
>>Quality Inspection
>>>Inspection Lot Creation
>>>>Inspection for Goods Movements
>>>>>Deactivate Quality Inspection for a Movement Type."
I wish you a nice day,
Albert
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Albert,
Thank you for your answer. I tried deactivating the QM for Movement type 655 and executed again. But it is still giving me the same error.To add on, currently we have not linked the set up either to WM nor eWM. It is inventory managed through Storage location.
For the given material, I have activated Z01, Z05 QM inspection types (similar to that of 01,05). I can successfully post the Delivery only when I deactivate both Z01 and Z05.
But we need Z01 for the PO Goods Receipt.
Regards
Vijaya.
Pl. note that 655 is the Movement type for which the error occurs
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
9 | |
8 | |
6 | |
5 | |
5 | |
4 | |
4 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.