cancel
Showing results for 
Search instead for 
Did you mean: 

Forecast basded Planning for material

former_member225662
Active Contributor
0 Kudos
64

Hi All,

I want to do forecast based planning for materials.

How to configure and wat are the settings required.

Can anyone explain me in detail.

Thanks in Advance

Regards

KK

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

For getting detailed idea about Forecast Based Planning pls go through the following link :

[Forecast-Based Planning |http://help.sap.com/erp2005_ehp_04/helpdata/EN/a5/e82be6a27311d3a82e0000e82a3c24/frameset.htm]

Hope this helps.

Regards,

Tejas