on 2024 Nov 21 7:12 AM
Dear Experts,
I want to activate finite scheduling at production order level but system is not suggesting new start date and finish date. System is also not picking shift when finite scheduling. I have maintained all necessary configuration and work center master data. Also attaching screenshot for points:
Also attaching error screen shot, Please suggest how to rectify this issue.
1) Tick mark for finite scheduling in work center
2) Shift and shift sequence maintained in work center
3) Formula maintained
4)Order control - availability check (01 & 02)
5) Scheduling Parameter
4) Production scheduling profile
Regards,
Tejas P.
Request clarification before answering.
Hello
Please follow the steps outlined in the following note to avoid error message CY831:
334455 - Message CY831 for availability check
In addition to that, the capacity availability check of an order always considers only the basic load on any work center.
If the capacities have not been confirmed / committed, the system shows that there is enough capacity available for the order. To evaluate the basic load, transaction CM07 with overall profile SAPSFC010 is the a better option.
Please consider the information provided on the following notes:
159337 - Capacity Check: Basic Load
160613 - Capacity check: Capacity availability check
You will find more information on SAP Help under Logistics -> Production Planning and Control -> Capacity Planning -> Capacity Leveling -> Capacity Availability Check -> Determination of Basic Load.
Regards,
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 30 | |
| 16 | |
| 16 | |
| 6 | |
| 5 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.