on 2025 Oct 11 6:43 AM
Dear SAP Team,
While cost run for period 006 we are facing below issue in preparation phase
Application Area Message Number Error Message Text Material Plant Material type
ML4HMASTER 106 1 Close previous period for material
Request clarification before answering.
1. Select the previous period that needs to be closed:
Example: If you're trying to close period 10/2025 and getting ML4HMASTER106
You need to close period 09/2025 first
2. If it's not allowed or you don't care about period 09/2025 anymore, you can set "Allow Open Status for Previous Period" on in the parameter setting of preparation step of Edit Actual Costing Run.
Then the error will be skipped.
Check further details:
3648497- Allow Open Status for Previous Period checkbox in Actual Costing - SAP S/4HANA Public Cloud https://me.sap.com/notes/3648497
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 29 | |
| 14 | |
| 14 | |
| 6 | |
| 5 | |
| 5 | |
| 4 | |
| 4 | |
| 4 | |
| 3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.