on 2021 Aug 23 1:47 PM
Request clarification before answering.
Hello
I think this message is very clear: You can only delete the discontinued material and the follow-up material together. System has been designed this way to prevent data inconsistencies.
Regards,
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Kiran,
Would you please check in MRP 2 Batch entry is kept blank. The batch will be created during the release of the order as per the setting in the production schedule profile for the plant in the batch management field.
Go to IMG->LOGISTCS GENERAL->Handling Unit Management->Basics->Production->Batch Split: Set Limit Indicator.
Thanks,
Sundhu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
39 | |
8 | |
6 | |
3 | |
3 | |
3 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.