Hi Everyone,
I'm facing strange behaviour in Time Evaluation with my newly prepared schedule.
The client wanted a schedule with the following settings:
The problem appears during the time evaluation. SAP counts the time before the start of the work as an absence, and I don't know why?
Could you give me a hint where should I search for the cause?
Request clarification before answering.
Hi Jakub,
I think the only way to find out is to run PT60 with "Display log" switched on and go through the schema.
Good luck!
BR,
Armin