on 2024 Dec 05 12:01 PM
We have a need to download costs from one WBE to another WBE both belonging to the same project with project profile: Investment Project .This is to be able to offload costs belonging to a lower level WBE to the parent WBE. We tried to create the settlement rule with object tipe WBS, but the ssystem give us this error: Settlement within project hierarchy is not possible.
Request clarification before answering.
To transfer costs, please use app Reassign Costs and Revenues.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The new app can be found in below link: