I wanted to freeze the SFG cost while valuating FG & hence I activated "do not Cost" in SFG material master. Post that when I run cost estimate for FG & try to view the cost component break-up, system does not bifurcate material cost into Raw Material, Packing material etc. but shows under cost component group "SFG". As a result, even CO-PA cost component breakup shown total material cost as SFG. The same is not the case if SFG is not ticked as "Do not Cost" indicator. Meaning: CO-PA cost component breakup shows "Raw Material", "Packing Material" etc.
Can anybody throw some light on this?
Help others by sharing your knowledge.
AnswerRequest clarification before answering.
Hi,
There are huge fluctuations in RM prices and those percolate down to SFG & ultimately FG. I want to run cost estimate for FG each month but would not like to impact the cost estimate with fluctuations in RM prices. Hence I would like to run cost estimate of SFG once in 6 months or once in 3 months & then would like to freeze the price. But would like to run cost estimate for FG each month. I would also not like to compromise on the cost component breakup as that is critical to my CO-PA reporting.
One of the solution is using Planned Price fields in material master of RM. But the volume of such RM is huge. So that is not a feasible solution.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 26 | |
| 13 | |
| 13 | |
| 6 | |
| 4 | |
| 4 | |
| 4 | |
| 4 | |
| 4 | |
| 3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.