on 2023 Nov 21 2:49 PM
Hi Gurus
I have one issue that I am facing with discontinued material i.e. Dependent req is not flowing to Follow-up material even after the stock of discontinued material is zero.
I had maintained all the required pre-requisites in BoM Material Master everywhere but am facing the issue kindly help me with the Same.
Request clarification before answering.