Creation of WBS elements from each line at VA01 (Automatic Project creation from SO)

0 Kudos
108

Hi,

I have made all the configurations for this particular scenerio, but i was wondering if there is a way to create WBS elements for each line at the sales order rather then the networks?

Thanks and Regards.

Accepted Solutions (0)