cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

Creating BOM from Task List with new Usage instead of Usage '4' within Table STZU

0 Likes
290

When creating a Task List via IA05, a Material is added to an Operation which creates a BOM in the background.
When you check Table STZU, the 'Usage' is maintained as '4' (Plant Maintenance).
How-To configure this to be another (new) Usage-Type  instead of '4' (Plant Maintenance)?

It has BOM-Type S, can it be linked with this Type?

Accepted Solutions (0)

Answers (0)