Create multiple purchase requests

dipak_kumar3
Active Contributor
0 Kudos

Hi,

I am planning MRP run based on MRP area involving 2 storage locations

I have 2 demand requirement coming from two sales orders having one line each.

In MD04 I see I have shortage, so I run MRP

Situation is

SO1 - Qty - 10 PCE - storage location1

SO2 - Qty - 10 PCE - storage location 2

Post MRP run

System should generate 2 PR one each for storage location 1 & 2. Instead system creates 1 PR for 20 PCE having storage location 1.

What exactly I am missing here?

Regards

Dipak

Accepted Solutions (0)

Answers (4)

Answers (4)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello Dipak,

MRP planned at plant level if the sales orders for same materials are having same date then system will create only one PR. If sales orders are having different date then if you use Lot Size EX Lot for lot planning in MRP1 view then system will create two PRs.

If you are in MTO  planning strategy like 20 then you can have two different PRs.


If possible share the screen shot of MD04 and MRP1 view.


Best Regards,

R.Brahmankar

kiran_kumar179
Active Contributor
0 Kudos

Dipak,

Maintain Respective each storage location for each line item in Sales order and maintain lot size as EX then Re run the MRP and See if that works.

BR
KK

Lakshmipathi
Active Contributor
0 Kudos

I believe through MRP area also, we can achieve the desired result which I am not sure.  Long time back, similar requirement has been achieved by my PP consultant with standard configuration.

Lakshmipathi
Active Contributor
0 Kudos

You have posted in a wrong forum and hence, you have not got any assistance.  Moved from SAP ERP SD Sales to SAP ERP Manufacturing - Production Planning (SAP PP)

dipak_kumar3
Active Contributor
0 Kudos

Hi,

Can any one suggest a way out?

Regards,

Dipak