on 2025 May 17 9:48 PM
Costing sheets attached to the costing variant through valuation variant working well in EPT system.
We created the same costing sheets in DEV system and transported them to TST system, we compared each entry of costing sheet between TST and EPT and were looking perfectly correct.
But when we created the cost estimate for the same material and plant both in TST and EPT, TST failed and EPT was successful, as it was calculating the Overheads through costing sheet.
We are not sure if this was due to Transport and we could not see any issues, unless there is a bug in the system while being transported
Request clarification before answering.
Hi,
Check the routing where you have mentioned the cost center and kindly also check that you have maintain Per hour activity cost for this cost center through t.code KP26.
BR.
Tariq Russel.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
17 | |
10 | |
7 | |
7 | |
6 | |
6 | |
6 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.