Costing items for material 21000001 in plant 204A without cost element.

Former Member
0 Kudos
4,876

Dear Friends,

Kindly suggest solution to below problem,

Costing items for material 21000001 in plant 204A without cost element.

Message no. CK597

Diagnosis

The itemization for material 21000001 in plant 204A contains valuation-relevant items without a cost element.

System Response

The costs of these item(s) cannot be included in the cost component split. This means that there will be inconsistencies between the cost component split and the itemization.

Procedure

Check the log for further system messages for material 21000001 in plant 204A. Correct the error and carry out costing again.

Thanks

Gaurav Chopra

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Thanks

The error has been resolved..

In master data itself.

For co-products , the version category was not maintained.

Moreover in BOM,

The items which were coproducts were not Ticked as co product.

Thanks..

Gaurav Chopra

Former Member
0 Kudos

I tried what you said,

But it does not help.

Gaurav Chopra....

0 Kudos

map gl accounts in obyc with semi finshed goods valution class and map raw material issued to subcontractor and sub contractor charges in oktz

Former Member
0 Kudos

Hi,

It seems some cost element are missing in Cost Component Structure in OKTZ. Please check with CO module.

Rgd,

Chetan

Aswanth
Explorer
0 Kudos
i tried but error not solved kindly help me how to solve the error