Does anyone have a step-by-step guide (or can guide me) to configure Phase Control Codes in the 9 phase Reactive Maintenance orders? Thanks Gurus
Request clarification before answering.
Hi Maria,
I would read these two pages first to understand the concept:
In the FAQ link above, there is an example of blocking a phase (Ready to Schedule) based on a permit-to-work process (no permit has been issued yet).
If this is insufficient, reply back with what you are trying to actually achieve. eg: What phase you are trying to block based on what context.
Tim