on 2020 Jan 09 7:31 AM
Hello Experts,
We have a situation where the component of a dummy assembly is not displayed in the production order as a part to be picked. The component is completely missing in the production order.
This material is pulled in the bill of material of the dummy assembly as Assembly.
The BOM and routing of component are already set to status 2 "locked".
Kindly help. Thank you.
Help others by sharing your knowledge.
AnswerRequest clarification before answering.
Issue is solved..deletion flag was set in BOM for that component.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
When you say dummy assembly why do you mean, Phantom item. what is the special procurement type in MRP2 view of the material master for this dummy material. Check if you can maintain 50 in this field.
What do you mean by BOM and routing status for components in locked, I think you meant say the production version is locked, it should be not locked for it to be of any use.
Go through the link attached and read about Phantom Assembly.
Regards
Abhishek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
What do you mean by dummy assembly and component are already set to status 2 "locked"?
Please share the screen shot of BOM, Routing and production order.
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Please check the BOM explosion was proper. Planned order would have created already before the BOM component was added.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
90 | |
8 | |
7 | |
5 | |
5 | |
4 | |
4 | |
3 | |
3 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.