According to the introduction of this article,I did some tests based on your blog.
MaterialMYCARClass(200/300)CL_COLOURCL_ENGINECL_EXHAUSTVariantCT_COLORCT_ENGINECT_EXHAUSTVariant Value01-RED01-120001-EXHAUST- 102-BLUE02-150002-EXHAUST- 203-Black03-180003-EXHAUST- 3ComponentsCOLOR-REDENGINE-1200EX-EXHAUST-1COLOR-BLUEENGINE-1500EX-EXHAUST-2COLOR-BlackENGINE-1800EX-EXHAUST-3I set the feature to allow multiple values.
I tried to use cu50 to select multiple property values, but did not expand the corresponding multiple component materials.
In addition, I also tried to allocate multiple different component materials with the same 200 classification and the same characteristic value. I hope to bring out multiple different materials when cu50 selects the same characteristic value, but I failed
ClassCL_COLOURVariant CT_COLORVariant Value 01-REDComponents COLOR-RED COLOR-RED-002Please experts to help me analyze
Can you tell me why?
How to implement these two scenarios?
thank you!
@ritesh.dube
Request clarification before answering.
Hi,
check out the following steps...
1. Created a Multiple-values char...
with values
2. Create the Following Class type 300 is created for main Configurable item..
3. Create the Following Class type 200 is created for variant assignments...
4.Note : you should use the same Char that you have used in Main Class (300) also for 200 class . otherwise bom selection won't work.
5. make following settings in Addnl data tab
6. Now Create Main Configurable Material and assign 300 class type in classification tab..
Also extend this material to any plant..since you have to create a BOM.
7. Create material for 1st components (variants) and assign 200 class , also make selection with applicable char value. Here I have selected Red...
8. Now create a BOM for Main material , TEST_MAIN and assign Item category K , and assign the class
9. Create Configuration Profile CU41 for main Material TEST_MAIN with below settings
10. Simulate in CU50 , select values and click the engineering icon and then the Result Icon, if you explode the BOM you see the Variants...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
When I use this material to create a MTO production order, the system prompts me that I have not maintained the BOM.
In fact, this material has a BOM of 200 ClassType.
Do you know what to do?
Thanks.
Message no. 29102
You want to allocate the BOM for material in plant to an additional plant.
No material master has been created in plant for this material. This means that there is no BOM for this material in plant either.
Hi,
It means that the Sales Order BOM has not been exploded. You can use CU51 to open and explode the Sales Order BOM , view the result and Save it.
Then you can execute MRP (MD50) for the Sales Order Item , Create a Planned Order and Convert the Planned order into Production Order. Then you should see the correct Box Components in Production Order.
What steps did you follow to create this Production Order ?
BR
Giri
User | Count |
---|---|
101 | |
16 | |
6 | |
5 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.