on 2025 Apr 06 8:47 PM
Hello Team,
We are facing some cases like a packing material issue; CKM3N"s actual value does not match the cost component level.
When we open the CKM3N, the actual value is 95,874.80 SAR, but when we analyze the details, the cost component level system indicates 95,804.88 SAR. The overall difference is 69.92 SAR. What is the problem in the system? Please explain the difference in detail, as well as the system"s behavior if the same.
Regards,
Pranita
Request clarification before answering.