cancel
Showing results for 
Search instead for 
Did you mean: 

Check for quality inspection in GR105

Former Member
0 Kudos
201

Dear All,

we are currently having a process where 2 step GRN is done. at the time of GR 103 the inspection lot is getting created. the stock is then checked by quality and a proper UD is made. finally the stock is moved from GR blocked stock to unsrestricted stock using movement type 105.

the requirement is to have a message issued to the user at the time of GR 105 if the quality decision has not been made and there is no UD for the inspection lot. is there a possible way with standard SAP to configure the same. else howto handle the same in development.

thanks in advance

Gurvinder

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

>

> Dear All,

>

> we are currently having a process where 2 step GRN is done. at the time of GR 103 the inspection lot is getting created. the stock is then checked by quality and a proper UD is made. finally the stock is moved from GR blocked stock to unsrestricted stock using movement type 105.

>

> the requirement is to have a message issued to the user at the time of GR 105 if the quality decision has not been made and there is no UD for the inspection lot. is there a possible way with standard SAP to configure the same. else howto handle the same in development.

>

> thanks in advance

>

> Gurvinder

We can create addtional field in PO, lets says in ADDITIONAL DATA tab and name this field Inspection Lot No., then whenver inspection is completed we enter data in this field indicating that the inspection is complete. Users first check whether this field

is populated, if yes, then only they release the GR through 105.

This can be done with help of ABAP, or some sort of check in MIGO can be made for movement 105, which is linked to this field, if this field is not populated, the migo will give users error. Check with ABAP, whether they can make this possible.

Edited by: Afshad Irani on May 23, 2010 3:12 PM

Former Member
0 Kudos

i dont feel this is available in standard SAP but you can develop such messages, try to check with ABAP for the required development.

Regards,

qsm sap