on 2022 Oct 20 10:34 AM
Hi,
we are currently using a solution with S/4HANA and EWM embedded, using Fiori apps.
For production, we implemented a scenario as the following:
- CO01/CO02: Create and release a manufacturing order, trigger WM material staging. Material availability is checked and all the components are available.
From the warehouse monitor (/SCWM/MON) I can see that Production material request (PMR) is created.
Storage area and production supply area are both in the same storage location which is managed with EWM.
Single-order staging is performed with /SCWM/STAGE. Warehouse tasks are not created due to the fact that the stock is not available (because not in the correct storage type or still in quality inspection).
Is there a way to check the material availability from a EWM point of view?
The Fiori App "Stage for Production" (ID /SCWM/MFG_STAGING) does not give me a stock visualization or tell me which component is not available.
Should I create all the possible warehouse tasks for all the available components and then analyse the stock of the missing components in the warehouse monitor?
Thank you for any advice.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Mateo,
in standard SAP in Fiori App "Stage for Production you have only an information how much stock of particular component is available on Production Supply Area.
There is an area of extension and you can add with developer some stock figures supported by a proper logic.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.