‎2025 Mar 11 7:12 AM - edited ‎2025 Mar 11 1:57 PM
Dear Expert,
I am using standard configuration for condition contract settlement process.
While using tcode WB2R_SC accounting document not generated.
For Delta accrual - Settlement document & accounting document generated. Posting Status shown Green ticked in settlement document - but Tax code missing at line item level in accounting document. why?
For Partial settlement - Settlement document created & posting status shown Blocked for accounting - Accounting document not generated. Why standard setting like this? I have Spro checked Configuration also.
Posting block for Transfer to Accounting - Unchecked
Same settings for delta accrual settlement type, but its working fine with accounting posting
Final Settlement - I am getting error WB2R130 - Settlement document for xx.xx.xxxx (date) are still changeable
Thanks,
Arindam Sur
Request clarification before answering.
Hi @arindamsur,
Thanks for your post. As explained via LinkedIn, your post doesn't have much information of the context you're facing but here are a few clarifications that might help address your issues:
1. In standard SAP CCM behavior, tax calculation is typically not required for delta accrual postings, unless you're operating in a specific country with mandatory tax requirements (e.g., I believe Italy is one of them).
Therefore, in most cases, the accounting document for delta accruals will not contain tax codes, and this is standard system behavior, not an error.
Since the system does not determine tax during accrual postings, the posting status will still show as green (posted successfully), even if tax codes are not present.
2. In standard configuration, Partial Settlement documents should post directly to accounting, unless you are using a two-step condition contract type (where manual release to accounting or collective settlement is required).
If you're not using a two-step contract type and accounting posting is blocked, the issue could stem from one of the following:
3. Final Settlement cannot be executed for consistency reason if the previous partial settlement was not release to accounting. Partial and Final Settlement can't be skipped for consistency reason.
Regards,
Gauthier Victor
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 36 | |
| 27 | |
| 21 | |
| 4 | |
| 4 | |
| 4 | |
| 4 | |
| 3 | |
| 3 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.