on 2025 Apr 04 8:55 AM
Scenario:
Our BOM ratio is 1: 2 means for 1 no of FG production 2 nos of Component is required. but while doing actual manufacturing sometime 3 or 4 componenets are required because of quality of component. so our client requirement is that during production confirmation, they input the extra quantity, therefore to track the record of extra quantity they require some other movement for consumption of the extra quantity. so can we use any other movement rather than 261 to consume the material through prodution order at the time of production confirmation.
Request clarification before answering.
Normally, we can use the planned goods issue and unplanned goods issue to distinguish the case you mentioned.
Planned and unplanned goods issues are two different types of material withdrawals in SAP:
Planned Goods Issue:
Unplanned Goods Issue:
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
| User | Count |
|---|---|
| 27 | |
| 25 | |
| 16 | |
| 4 | |
| 3 | |
| 3 | |
| 3 | |
| 3 | |
| 3 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.