on ‎2024 Mar 08 12:43 PM
Hello
I have created a simplistic 3D model from the CAD desktop and asked to associate a MM to it:
A document and the associated MM were created.
The tabs of the material have been filled in automatically, but in the basic data 2 tab , the CAD indicator is not checked (this indicates that an item has been created by CAD interface). Could you please tell me which custo is missing in the cdesk_cus transaction? I haven't found anything.
In addition, I see in the "Purchasing" tab that the Plant-sp.matl status field is at status 03 when it should be at "awaiting validation (98)". Could you please tell me which custo is missing in the cdesk_cus transaction?
Thanks in advance
BR
Request clarification before answering.
| User | Count |
|---|---|
| 40 | |
| 21 | |
| 15 | |
| 6 | |
| 3 | |
| 3 | |
| 2 | |
| 2 | |
| 2 | |
| 2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.