on 2015 Feb 03 10:50 AM
Dear sapient
Client have two different server i.e HR & Travel management have been configured in one server and main sever where FI & other respective module have been configured including funds management. so client requirement is budget control should be there during the time of travel request creation (PR05/TRIP). kindly let me know how to activate budget control through funds management as both are in different server.
We are using EHP6 version and fund management already activated and working fine.
Thanks Regards
Sasanka
Request clarification before answering.
Hi Eli
Thanks for your valuable reply. Our case is bit different actual FI posting done by user in one server and travel request generation(PR05/TRIP) is in other server hence can it be possible to control the budget through interface because direct FI posting through FB60 or F-02 does not have link with travel request. Please kindly suggest how the budget will work for complete cycle from request generation to actual posting in FI moudle.
Thanks & regards
Sasanka
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I'm not sure what your expectations from the system are. If you manage an activity, say travel management, in one SAP instance and you have budget control in another, how do you want to integrate the flow? Either you replicate, at least at the required minimum, TV settings in your target system in order to allow registry of travels coming from your HR SAP client, or you integrate (merge) two clients together.
Regards,
Eli
thanks all for reply
yes interface is going to be created through RFC between two system.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Well, when you would have the interface, then you can analyse the settings in FM. I guess, your future interface will send already approved expenses on the travel as FI document. In this case, no special integration would be required. You will just have to secure that correct FM assignment is sent with the document.
Hello Sasanka, I think there is no matter they are on separate servers, the ERP works like "one" system.
FM/BCS must be set to the operators from SAP TM.
Did you run the PR05 with FM trace?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I don't get your point. Are you saying that you have HR system in one SAP instance and FI/FM - in another? In this case, what kind of activation do you foresee? You have to set up a system of interfaces between the two instances, so that FI/FM would receive the necessary data. Obviously, you cannot control in system 'A' what happening in system 'B' without having interaction between them.
Regards,
Eli
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.