Bottleneck work center to multiple operations

sangeet_dadwal
Explorer
0 Kudos
183

Dear SAP Expert,

I assigned bottleneck work center to multiple operations in a routing. For example, I assigned work center (WC1) to operation 0010 and 0020. Now when I want to schedule capacity using Capacity Scheduling Table app for operation 0020 I cannot as SAP only considers the lowest operation 0010 for capacity scheduling even if the 0020 is a bottleneck. 

How can i schedule operation 0020 in Capacity scheduling table app or both 0010 and 0020 when both are being worked on same bottleneck work center WC1.

View Entire Topic
cindychen
Product and Topic Expert
Product and Topic Expert
0 Kudos
Hi, The scrap you input is the operation scrap which does not reflect to the scrap in the production order header. The scrap in the production order header is the assembly scrap. The assembly scrap will add your order quantity. For example, you want to produce 100 quantity assembly material, you need to set the order quantity as 102 if there is 2% scrap portion. Means that you will scrap 2 quantity.