I assigned bottleneck work center to multiple operations in a routing. For example, I assigned work center (WC1) to operation 0010 and 0020. Now when I want to schedule capacity using Capacity Scheduling Table app for operation 0020 I cannot as SAP only considers the lowest operation 0010 for capacity scheduling even if the 0020 is a bottleneck.
How can i schedule operation 0020 in Capacity scheduling table app or both 0010 and 0020 when both are being worked on same bottleneck work center WC1.