on 2024 Aug 20 4:16 PM
Hi,
I'm trying to create production order and don't want the system to look for the BOM, I need production without BOM. But I'm getting this error while doing cost check in production order.
Message No. CO636
I've checked the setting in OPL8, the BOM explosion is blank (Do not read BOM).
Please advise.
Thank you.
Request clarification before answering.
1. You can create a BOM without any components.
2. Create a new production version with this BOM.
3. create production order with this new production version.