on 2024 Oct 05 9:45 PM
Hi Experts,
I have two inspection plans with different specifications for the same material, and I want that at the time the GRN system reads the only specific inspection plan that should be read. Is this possible to automate?
If yes, then how can we do this? Please guide.
Thanks.
Request clarification before answering.
Dear ZaheerAbbas1,
thank you for the details provided.
It worth to check this customer exit in transaction SMOD:
Enhancement QPAP0002
"Description
With this enhancement you can influence the plan selection in the inspection lot. You can also edit an additional field (MAPL-SUCHFELD) during the material/plan assignment in the plan maintenance transaction.
To allow this additional field to be processed, three exits (EXIT_SAPLCZDI...) have been integrated into the plan maintenance transaction. Only one exit each can be activated when formatting the selection parameters in the inspection lot program (EXIT_SAPLQPL1_001) and plan selection program (EXIT_SAPLQPAP_002)."
I wish you a nice day,
Albert
SAP Support
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Abbas,
To my knowledge this is not possible, as the system only can assign a unique inspection plan. If not a single/unique inspection plan can be determined by the system you should assign it manually to the inspection lot.
Alternatives to make plans unique: adjust the validity dates of the plans, assign specific suppliers to the inspection plans, delete a inspection plan so only one plan exists for the material.
Herman.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
15 | |
7 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.