Hi friends
What is the steps involved in configuring Automatic GR/GI.
Is there any link related to this?
pl send me that also.
Dear,
For automtaic GI you need to active the Backflush indicator in Material master MRP2 view.
For automatic Gr you need to active the tick mark for auto GR in control key OP00. Or use SAP standard control key PP03 in last operation of routing.
Or in OPKP active tick mark for auto gr and assign this scheduling profile to work scheduling view of material master.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
dsfg
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
if auto GI failed , all it will go to COGI
Process the COGI
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
i am unable to complete
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Rheya,
Confirm that the order doesn't contain more than one auto GR control key. Remove the all the other control keys & keep only on control key with auto GR.
If it's so then carry out GR with MB31 for this time.
Also if in future if you don't want to face this situation then do following settings in 'Define confirmation paramerts' in T code OPK4, in 'General individual entry' tab page tick the 'Goods movement' & 'Termination of Confirmation if Incorrect Goods Movements'.
So that with the confirmation we won't be going to miss the goods movement activity.
Hope this hwlps you.
SmanS
Hi,
Auto GR
if you want to maintain at Operation level use-PP03 control or matain Auto GR indicator
for Material level
OPKP is for Production oorder scheduling Production Order Profile
CORY is for Process Order scheduling Profile. maintain Auto GR indicator
Auto GI
Auto GI is nothing but backflushing
we cam maintain at Material, Work center and Routing
For Material MRP-2 Backflushing indicator 1
For Work center- Maintain backflushing indicator at Basic data tab
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rheya
For automatic GR of FG & auto GI of components, do the following settings
In MRP 2 view, select option 1 for Backflush for components & FG.
In routing (FG), at the final operation select PP03 control key.
Regards
UK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Rheya,
AutoGI is nothing but seting backflush indicator.
The backflush indicator can be set in three places.
1. In routing against the component.
2. In the work center.
3. In the material master.
These settings gets copied to the roduction order. There in that order you can tick or untick the backflush indicator in the component overview.
For auto GR you can have settings in two places.
1. In the control key
2. In the production scheduling profile, T code OPKP. You need to assign this PSP in the material master of FG, in the work scheduling view.
If you have above said settings then system will propose the components & FG or header material while doing operation or order confirmation.
Hope this helps you.