Hello Friends
Iam using Approved master recipe .
I have production version 001 with recipe group / group counter and alternate bom 1
I want to create production version 002 with same recipe group / group counter and alternate bom 2
When i create production version 002 in C223 then i get following message . How to create Production version 0002?
Message no. CFV055
You want to maintain a different master recipe for the detailed plan of the production version. The master recipe specified is subject to engineering change management. You need a change number to change the detailed plan.
Request clarification before answering.
Hello
The procedure in the environment requiring an approval is the following: -> Create
1. Create new production version, without specifying recipes and bill of material.
2. Assign a change number which is valid for the recipe and the bill of material to be entered to the production version.
3. Enter recipe and bill of material in the production version or if external number assignment of the recipe is required, make no entry in the recipe group.
4. Navigate to the recipe, for example, by double-clicking on the Recipe field.
5. Maintain the recipe and the material list (bill of material) within the recipe as usual.
6. Save the recipe and, therefore, also the bill of material. (Return to the production version transaction. )
7. Save the production version. ->
Change
1. Assign a change number which is valid for the recipe and the bill of material entered or to be entered to the existing production version.
2. Navigate to the recipe and further processing as described under -> Create.
Also Refer KBA 541518 - Approval of recipes
Regards,
Abhishek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
10 | |
8 | |
6 | |
4 | |
4 | |
4 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.