Hi Experts!

I have a question , can we allocate the raw material consumption for production order automatically?

Because of our customer consumption raw material always different from the Bill of Material. So they hope there are a solution or menu for allocation consumption raw material to be automatically.

Any suggestion ?

Thank You!

Accepted Solutions (1)

Accepted Solutions (1)

Expert
Active Contributor
0 Kudos

Hi,

Thanks for confirmation. In that case you can consume raw materials automatically, with the functionality Backflush(conusmption) during order confirmation according to the BOM. If there is a quantity difference then it should be done manually.

In case you want the quantity to be filled automatically based on the volume of the item and do not want to use backflush, then there is no option to default.