on 2016 May 18 4:16 PM
Hi,
We have 3 operation is production order and Inspection characteristic are assigned on operation 0020. When we create production order of quantity- 5 PC. And we are confirming first operation of qty-1/5 and confirm second operation of this same item.
Then its giving the Error message as -Actual data for QM characteristics of operation 0020 missing. this is working fine as per our requirement.
And then i confirm third operation.
When i start confirming 2/5 PC and confirm operation 0010. but when i operation 0020(without maintaining characteristic for this item(serial number), system allowing me to confirm.How to control this as i have not maintained the results for second item-2/5 serial number but maintained only for first serial number item.
Request clarification before answering.
Hello,
I hope you have maintained the confirmation parameter OPK4 correctly for Results Rec. (QM)
Please try by implementing SAP note 2023351 - No message for inspection characteristics without inspection results
Best Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
88 | |
12 | |
8 | |
5 | |
4 | |
4 | |
3 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.