How does customers manage transfer of design information to production? How to bridge the gap between Engineering and Manufacturing stages?


Transferring Product Data from Engineering to Manufacturing is one of the most critical processes for any manufacturing company. Mistakes here will easily lead to higher costs, missed time targets and quality issues.


Let me show you in this blog in a step-by-step process of how a Production Engineer can easily load a Engineering BOM as a reference and derive a Manufacturing BOM by planning, restructuring and add Manufacturing consumables to the Manufacturing BOM.



Introduction –


Intelligent Handover is a capability of SAP Enterprise Product development which empowers Production Engineers to simplify and accelerate the transformation and synchronization of Engineering Bill of Material information into Manufacturing Bill of Material.



Product Life Cycle from Design to Operate


It bridges the gap between Engineering and Manufacturing by managing dependencies between source and target structures – namely EBOMs and MBOMs. It does that by (semi-)automating the incorporation of changes that may occur on either side, supporting the user by finding strategies for reconciliation and initial creation of the target structure and it will check for consistency. Be it in terms of used material or quantity consumption.



Process flow and Step by Step Guide for Handover from EBOM to MBOM 


User having a role of Production Engineer/Administrator role can access our application in the EPD capability. The user who will be using the application will be a Production engineer to derive a Manufacturing BOM from a Engineering Bom in the plant he is responsible for.


The below diagram shows a process flow for initiating a handover for creating a target manufacturing BOM from a source engineering BOM performed by Production engineer.



Process Flow



Step 1 – Initiate Handover Process


initiates a Handover process as the first step by searching for an Engineering BOM in the Worklist application. User selects the EBOM and clicks on Create Handover option where the EBOM details are prefilled for the Source and user maintains the Target Usage, Plant, validity, and description. The user will be navigated to the Planner application where the Engineering BOM will be loaded in the Source panel and a default node for the target MBOM is created in the target panel.



Worklist Application



Initiate Handover



Step 2 – Explode the Source BOM into multi-level BOM hierarchy


The user can explode the BOM into a multilevel hierarchy by selecting components which have an assembly indicator. He can now click on the “Load EBOM” option. If there are multiple alternatives present in the system for the BOM, the user can choose which alternative he wants to load. The respective BoM will be loaded as part of the Source structure available for planning.



Planner Application Load EBOM option



Source BOM expanded to multi level hierarchy



Step 3 – Plan the components from Source to create target manufacturing BOM


The Production Engineer can now plan the components from Source to Target. He has the following options to create the target manufacturing BOM:




  • by selecting one or more assemblies and clicking on “Plan-As-Designed” option. This will plan the entire assemblies as they are present under the selected target node.



Plan As Design option



Sub-Assembly planned




  • by selecting one or more components in the Source and selecting the Target component and click on the “Plan-As-Selected” option. This will plan the source components as children of the selected target component.



Plan as Selected




  • By selecting one or more nodes in the source structure and dragging and dropping into a target node.



Drag and Drop



Add Manufacturing components to Target MBOM manually


The Production Engineer selects the target node under which an additional manufacturing component shall be loaded. This scenario comes up when the component is consumed during manufacturing but not part of the Design structure. One example may be Oil to lubricate a sub-assembly. User clicks on “Add BOM Items” to search and select the BOM Items into a selected assembly or component in the Target panel.



Add Component feature



Quantity consistency and Highlight feature


User can check whether the component planned is completely consumed in the target or not by checking the status associated with the node. If the component is planned more than what is available in the source, then a status “Quantity Overconsumed” is maintained otherwise if the component quantity is maintained less in the target tree than what is available in the source tree, then a status “Quantity Under consumed” is maintained for the target Node.



Quantity consistency checks


User can select the option – Highlight by selecting either the source or the target component and by clicking on the option, the corresponding node in the other panel will get highlighted. This option will allow user to identify the source component from which a particular target component got derived from as shown in the above figure.



Step 4 - Publish the information to S4


After completing the planning and finalizing the target BOM user can click on “Publish” to synchronize the data back to S4/HANA to create the target Manufacturing BOM there. Once published and successfully completed then an alternative for the MBOM will be created in the SAP S/4HANA system and status of the Handover activity will be updated to “Published”.



Publish option in Planner application



Synchronization of data successfully



Step 5 – Release Handover activity


User can click on “Release” option in the handover activity which will set the status of the planning as “Released” and will not allow users to not maintain the target BOM in the planner application further.



Release option in Planner application



Handover activity with status as Released


In this way a Production Engineer can easily create a Manufacturing BOM using a source Engineering BOM with SAP EPD Intelligent


With SAP Engineering Product Development Intelligent Handover, it ensures Production Engineers seamless development and handover of product data to manufacturing, reduce rework costs by easily identifying any inconsistencies and incorporate them.


Avoid disruption to engineering design and production operations by improving digital product data to speed up the factory ramp-up by creating a seamless end-to-end product data across your products or assets lifecycle.



References –


You can find more information about SAP EPD Intelligent Handover in below link –


https://help.sap.com/docs/PLM_EPD/b183c303b8fc4254a08e565cdee4e163/c82a2df97c0b40cb8562f54c0dd6162d....


Kindly ask any questions in the comment section.


<<Change Incorporation Process using SAP Enterprise Development Intelligent Handover in the next Blog>>